Dover Hydraulics

PROJECT DESCRIPTION

A 5000 sf design/build addition to the client’s existing facility that featured an extension of their existing crane system.

  • Location: St. George, SC
  • Completion Time: 3 Months
PROJECT BACKERS

We would like to thank the following people for assisting with this project.

  • Architect: GS3 Architects
  • Owner: Dover Hydraulics